From first measure to handoff
Method pages spell the verbs we use on the floor—draft the field, press the clay, glaze the chips, fire the lot, pack with labels.
Method pages spell the verbs we use on the floor—draft the field, press the clay, glaze the chips, fire the lot, pack with labels.
Materials shown here are the ones we keep stocked; substitutes are named before work starts.
Day counts begin after approvals and material locks, not after the first email.
You will see what we refuse: rushed cures, over-brightening, or stitches that cannot survive a pocket.
Questions that need photos are easier by form than by phone; attach details in the message field.



How long for a custom field?
Most wall lots need 18–28 days after glaze chips are approved.
Do you install?
Local installs by agreement; otherwise we pack for your tiler with layout notes.